A quick break in the weather was cause for celebration and 1200' of water piping! The HVAC contractor was finally able to trench in the loops for the geo system; and then it snowed 6 inches the next day. Talk about just in time.
Saturday, February 2, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Spiffy. I find those systems to be quite interesting. I'll be interested in seeing how it works out for you.
Post a Comment