The driveway has been framed out and the drainage lip trimmed down (to prevent backs from going out of alignment pulling into the driveway) and now we're just waiting for the garage side of the house to get bricked to try and pour the driveway before winter sets in.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment