Monday, February 18, 2008

Monday, February 11, 2008

More wiring...

The 2 story living room provided us a real treat to get wired and some experience in setting up scaffolding.

Service panels were installed in the garage and basement:


Satellite/phone/internet wires and the media box they'll wind up in:

Saturday, February 9, 2008

Saturday, February 2, 2008

Geothermal Trenching

A quick break in the weather was cause for celebration and 1200' of water piping! The HVAC contractor was finally able to trench in the loops for the geo system; and then it snowed 6 inches the next day. Talk about just in time.