The 2 story living room provided us a real treat to get wired and some experience in setting up scaffolding. Service panels were installed in the garage and basement: Satellite/phone/internet wires and the media box they'll wind up in:
A quick break in the weather was cause for celebration and 1200' of water piping! The HVAC contractor was finally able to trench in the loops for the geo system; and then it snowed 6 inches the next day. Talk about just in time.