Sunday, April 20, 2008
Approaching Level 5
The mudding and taping and sanding (repeat a bunch of times) has finally completed. The final wall surfacer (which also doubles as a primer for paint) was sprayed on. Boy they're smoooooth.


Thursday, April 17, 2008
More concrete work
Wednesday, April 16, 2008
Tuesday, April 15, 2008
Don't look now, it's a driveway!
Saturday, April 12, 2008
Mud & Tape
Well the drywall contractor has indicated he's got about a week's worth of mudding and taping to do to complete the finish on the drywall. We elected to do something a little different than most homes in the area. Instead of plaster veneer, we're getting what's called a Level 5 finish on the walls. This eliminates the gritty texture of plaster and provides an additional protective coat on the face of the walls. It's supposed to be smooth as a baby's butt and show no seams or screw holes.


Wednesday, April 9, 2008
More Drywall
Saturday, April 5, 2008
On the walls and what a mess
I've put up a few sheets of drywall in my day but to watch these guys do it makes me feel... well, completely inadequate. They've got 12 screws in the board by the time I get one on the tip of the gun. I also think, for these guys anyway, the RotoZip drywall router was the best tool ever invented. I bet those old time drywallers sit and curse this tool when they meet at the coffee shop drinking coffee with scarred hands from having to cut out all those fixtures and receptacles by hand.
Kitchen area


Upstairs bathroom

Upstairs bedroom

Garage
Kitchen area
Upstairs bathroom
Upstairs bedroom
Garage
Subscribe to:
Posts (Atom)