Wednesday, March 26, 2008
Tuesday, March 25, 2008
Insulation!
Wednesday, March 19, 2008
Day of Reckoning
Today was a pretty important day. Inspection Day!! (x3) Framing, plumbing, and the 2nd of our electrical inspections all took place today... here's how we did:
With the rough-in inspection out of the way a lot of things that were waiting on it will be happening in the next week or so weather permitting. Insulation has been scheduled 2 days away along with drywall the following week. If the weather holds, the gutters, soffit, and fascia will be installed along with the water meter and sewer system. Not to mention the driveway and front porch concrete work as well. Hopefully with the 8" of rain over the last 24 hours we'll be dry for a while.
With the rough-in inspection out of the way a lot of things that were waiting on it will be happening in the next week or so weather permitting. Insulation has been scheduled 2 days away along with drywall the following week. If the weather holds, the gutters, soffit, and fascia will be installed along with the water meter and sewer system. Not to mention the driveway and front porch concrete work as well. Hopefully with the 8" of rain over the last 24 hours we'll be dry for a while.
Wednesday, March 12, 2008
Furnace installation
Wednesday, March 5, 2008
More wiring updates
Subscribe to: