Tuesday, March 25, 2008

Insulation!

Master bedroom blown in...

Kitchen/dining area:

2nd story bedroom batting/blown:

Garage:

Overlooking the living room:

Wednesday, March 19, 2008

Day of Reckoning

Today was a pretty important day. Inspection Day!! (x3) Framing, plumbing, and the 2nd of our electrical inspections all took place today... here's how we did:

With the rough-in inspection out of the way a lot of things that were waiting on it will be happening in the next week or so weather permitting. Insulation has been scheduled 2 days away along with drywall the following week. If the weather holds, the gutters, soffit, and fascia will be installed along with the water meter and sewer system. Not to mention the driveway and front porch concrete work as well. Hopefully with the 8" of rain over the last 24 hours we'll be dry for a while.

Wednesday, March 12, 2008

Furnace installation

The geothermal unit finally was freed from its crate in the basement and hooked into the ductwork and pipes connected to the loops outside.


Wednesday, March 5, 2008

More wiring updates

Outside meter can prior to inspection.

Basement breaker panel

Garage breaker panel

Meter can after inspection and meter installation (you can also see some of the final deckwork underway as well.)